COST OF SOIL PREPARATION
DRY COST (R / HA)
DIESEL USAGE***
TYPE OF ACTION
± 800mm depth
± 1 200mm depth
± 800mm depth
± 1 200mm depth
R12 610/ha R16 310/ha 250 ℓ /ha 300 ℓ /ha R14 830/ha R17 800/ha 275 ℓ /ha 330 ℓ /ha R22 250/ha R25 215/ha 415 ℓ /ha 470 ℓ /ha R28 180/ha R35 590/ha 525 ℓ /ha 605 ℓ /ha R18 395/ha R23 730/ha 340 ℓ /ha 440 ℓ /ha R29 660/ha R35 595/ha 550 ℓ /ha 660 ℓ /ha R19 275/ha R23 730/ha 360 ℓ /ha 440 ℓ /ha R24 390/ha
Rip easy soil (wide furrow width: ±1 000mm*)
Rip difficult terrain and soil (narrow furrow widths: ±750mm**)
Rip and cross easy soil (wide furrow width)
Rip and cross difficult terrain and soil (narrow furrow width)
Deep mix and delve plough (without rip)
Rip and cross delve (narrow furrow width)
Single blade rip and 3 blade cross-mix rip
500 ℓ /ha 640 ℓ /ha 280 ℓ /ha 100 ℓ /ha 140 - 180 ℓ /ha 90 ℓ /ha 23 ℓ /hour
Extreme conditions blade rip (60+ ton bulldozer)
Spit delve full area (22 ton excavator)
R32 360/ha
Spit delve only on rows and ridging (22 ton excavator)
R14 800/ha
Ridging of rows with bulldozer (Komatso D155)
R6 645/ha
Deforestation (Komatso D85)
R8 295 - R10 650/ha
Remove vines with wing (Komatso D85)
R5 315/ha
Excavator (Komatso ±22 ton) – work tempo dependent on soil type
R1 195/hour
CONSTRUCTION OF DAMS AND DRAINAGE
*Drainage (per meter)
R385/m
R37.30 - R47.90/m³ R52.80 - R63.80/m³
**Construction of dam (per cubic meter storage volume) (Easy soil / material nearby, Volume > 100 000m³)
**Construction of dam (per cubic meter storage volume) (Difficult soil / material far, Volume < 100 000m³)
* Cost of drainage includes all costs (calculated at a depth of 2m, moderate soil). ** Diesel included and consultant fees. Costs can vary depending on the location, slope, type – as well as availability of material on-site. *** Diesel consumption is realistic norms (which vary between different manufacturers).
SOURCE: VINPRO