SATI STATISTICS OF TABLE GRAPES IN SOUTH AFRICA 2020
COST OF SOIL PREPARATION
COST I NFORMATI ON
DRY COST (R / HA)
DIESEL USAGE
TYPE OF ACTION
± 800mm depth
± 1 200mm depth
± 800mm depth
± 1 200mm depth
R10 500/ha R12 125/ha 250 ℓ /ha 275 ℓ /ha R12 125/ha R14 550/ha 275 ℓ /ha 330 ℓ /ha R18 200/ha R20 650/ha 415 ℓ /ha 470 ℓ /ha R23 000/ha R26 675/ha 525 ℓ /ha 550 ℓ /ha R15 960/ha R19 400/ha 340 ℓ /ha 440 ℓ /ha R24 000/ha R29 100/ha 545 ℓ /ha 660 ℓ /ha R18 200/ha R19 400/ha 410 ℓ /ha 440 ℓ /ha R20 550/ha
Rip easy soil (wide furrow width: ±1 000mm*)
Rip difficult terrain and soil (narrow furrow widths: ±750mm**)
Rip and cross easy soil (wide furrow width)
Rip and cross difficult terrain and soil (narrow furrow width)
Deep mix and delve plough (without rip) Rip and cross delve (narrow furrow width) Single blade rip and 3 blade cross-mix rip Extreme conditions blade rip (60+ ton bulldozer)
500 ℓ /ha 640 ℓ /ha 280 ℓ /ha 100 ℓ /ha 140-180 ℓ /ha 90 ℓ /ha 23 ℓ /hour
Spit delve full area (22 ton excavator)
R29 500/ha R13 500/ha R5 970/ha
Spit delve only on rows and ridging (22 ton excavator) Ridging of rows with bulldozer (Komatso D155)
Deforestation (Komatso D85)
R7 000 - 9 000/ha
Remove vines with wing (Komatso D85
R4 000/ha
Excavator (Komatso ±22 ton) – work tempo dependent on soil type
R1 060/hour
CONSTRUCTION OF DAMS AND DRAINAGE
*Drainage (per meter)
R295/m
**Construction of dam (per cubic meter storage volume) (Easy soil / material nearby, Volume > 100 000m³) **Construction of dam (per cubic meter storage volume) (Difficult soil / material far, Volume < 100 000m³) * Cost of drainage includes all costs (calculated at a depth of 2m, moderate soil) ** Diesel included an Consultant fees. Costs can vary depending on the location, slope, type- as well as availability of material on-site. *** Diesel consumption is realistic norms (which vary between different manufacturers)
R20 - R30/m³ R30 - R40/m³
SOURCE: VINPRO
SATI STATISTICS 2020 49
Made with FlippingBook - Online catalogs